Monday, May 28, 2012
Final display idea
Okay this is how I want to show my work. I will print it and display it like this. I am still not sure that printing them and putting them on the wall is the best idea, I think I need to see the space to decide.
idea 1 for how to organize photos
I am trying to visualize how I am going to display my work. I think this might work, but I am not completely happy. I am going to come up with another idea.
Sunday, May 27, 2012
Sunday, May 20, 2012
Sunday, May 13, 2012
Monday, May 7, 2012
Wednesday, May 2, 2012
Downtown Eugene Tilt Shift Photography
Wednesday, April 25, 2012
Time Lapse photo
I took over 200 pictures today, trying to get some "time lapse" tilt shift photos. I then worked in photoshop and came up with this image. I am thinking about doing a series of these. I have one more idea with this same set of ideas. I will post it when I get it done in PSD.
Sunday, April 22, 2012
Portland industrial tilt shifts
Portland industrial shots. These were more successful than the Butte photos. I still have some work to do on perfecting the look of tilt shifts and on taking shots that work best for the effect. But these were great practice and I think a few turned out pretty good.
before |
After |
before |
after |
before |
after |
before |
after |
before |
after |
Butte attempts
Sunday, April 15, 2012
schedule
This is my time frame to get my senior project finished by week 10 on Monday.
This week is week 3-
I just took some pictures in PDX and plan on working on them and "perfecting" the tilt shift look.
Week 4 and 5-
Scout some locations that could get me good Eugene pictures that would be good for a downward angle and take the photos.
Week6 and 7-
Work on the photos and get them finished to print.
Week 8-
Get them to the printers and picked up. Fixing any that need fixing. (printing or production fixes).
Week9-
Final touches- framing? Ready for display.
Have them ready to present week 10.
This week is week 3-
I just took some pictures in PDX and plan on working on them and "perfecting" the tilt shift look.
Week 4 and 5-
Scout some locations that could get me good Eugene pictures that would be good for a downward angle and take the photos.
Week6 and 7-
Work on the photos and get them finished to print.
Week 8-
Get them to the printers and picked up. Fixing any that need fixing. (printing or production fixes).
Week9-
Final touches- framing? Ready for display.
Have them ready to present week 10.
Wednesday, April 11, 2012
Senior project links for tutorials
Okay so since I have decided to go with a tilt shift photo. I found some tutorials I will go through to achieve this "fake tilt shift" photography.
http://www.photoguides.net/photoshopping-tilt-shift-video
http://visualphotoguide.com/tilt-shift-photoshop-tutorial-how-to-make-fake-miniature-scenes/
http://vimeo.com/8067860
http://www.photoguides.net/photoshopping-tilt-shift-video
http://visualphotoguide.com/tilt-shift-photoshop-tutorial-how-to-make-fake-miniature-scenes/
http://vimeo.com/8067860
Sunday, April 8, 2012
Ideas for Project
Wednesday, April 4, 2012
Subscribe to:
Posts (Atom)